Application Case
Turbo Blower
SmarTurbo is a group company focused on R&D, manufacturing and sales of high speed turbo blower, turbo compressor and turbo blower aerator. We have built the most comprehensive research and development system of high speed permanent-magnet synchronous motor, air bearing and magnetic bearing and aerodynamics for mass-production of turbo blower, turbo compressor and turbo blower aerator.
| Project Location: Qingdao, China | |
|---|---|
| Project construction scale: | 25,000 tons/day, pressure 60kPa |
| Project modification contents: | One set of 75kW high speed turbo blower replaces the original two sets of 55kW blowers to satisfy air flow requirements of the whole sewage treatment plant. |
| Main equipment: | 75kW high speed turbo blower |
| Investment amount: | 15 thousand RMB |
| Construction cycle: | 7 days |
| Project economic benefit: | It saves about RMB 120,000 in electricity bills every year, and the investment can be recovered within one and a half years |
| Project Location: Penang, Malaysia | ||
|---|---|---|
| (work for 1 month) | 10HP roots blower 7.5KW | 15HP roots blower 11kw |
| Electricity consumption: | 5400 kWh (7.5 kWh * 24 hours * 30 days) | 7920 kWh (11 kWh * 24 hours * 30 days) |
| Electricity bill: | 2733.8 MYR (200kWh * 0.435 MYR/kWh + 5200kwh * 0.509 MYR/kWh) | 4016.48 MYR (200kWh * 0.435 MYR/kWh + 7720kWh * 0.509 MYR/kWh) |
| Saving | 1282.68 MYR | |
| Note: 1 USD = 4.4 MYR (2022.5.16) | ||